Justicia Marin supplies build-to-print cable assemblies for manufacturers, OEMs and integrators: we act as a custom cable assembly supplier and manage cable assemblies made by manufacturers in our network. You define the drawing, the sample or the requirements; we select the right manufacturer, coordinate the manufacturing and manage the delivery in the agreed quantity and lead time.
What it includes
A build-to-print cable assembly can include several conductors, branches, terminals, connectors, sleeves, protections, labels, groupings and fixing points. Our job is to translate your specification into an order that a manufacturer in the network can repeat without deviations, and to verify the result before it reaches your line.
Common applications
These are the uses that reach us most often. If yours does not fit exactly, send us the specification and we will study it.
Interconnection assemblies inside machinery and equipment: power, signal, control and communication between modules, with lengths and outlets defined by the drawing.
Links between electronic board, sensors, actuators, displays or power supplies, where the connector and the pitch determine the whole assembly.
Cabling prepared to be fitted in a cabinet or panel, grouped and identified so that the fitter does not have to interpret anything.
From single units to validate a design to recurring runs with the same configuration order after order.
Starting data and criteria
The quote is prepared on the information available and sets out in writing the scope the selected manufacturer can take on.
If the application is subject to requirements such as the RoHS Directive, it is advisable to define them in the specification and in the documentation requested from the manufacturer.
Decision points
These three milestones turn an initial need into a configuration that can be ordered again without reinterpretation.
You send us the specification
Drawing, schematic, physical sample, photographs or component list. The more complete the information, the more precise and faster the quote.
You validate a sample
When the project requires prior validation, the selected manufacturer prepares a sample and you approve it on your own equipment before the agreed quantity is launched.
We supply and ensure continuity
We coordinate delivery in the agreed quantity and lead time, with the agreed documentation and the same configuration in later orders.
How we coordinate the supply
The aim is for you to approve a sample before a quantity is manufactured, so that nobody buys blind.
Review of your specification
Drawing, schematic, physical sample, photographs or component list. The more complete the information, the more precise and faster the quote.
We review and propose
We analyse feasibility, propose equivalents when a part number is hard to source and send you a quote with price, lead time and conditions in writing.
Sample approval
If the project requires prior validation, we coordinate a sample for your approval on your own equipment before launching the series.
Supply and continuity
We coordinate delivery in the agreed quantity and lead time, with the agreed documentation and the same configuration in later orders.
Coordinated manufacturing
Manufacturing build-to-print cable assemblies does not require the same processes or the same controls for a prototype as for a recurring series. That is why we do not work with a single shop: we assign each project to the manufacturer in the network whose tooling, processes and control capability fit what your specification requires.
If you are looking for a custom cable assembly manufacturer, Justicia Marin coordinates the manufacturing with specialised manufacturers, selected according to the drawing, materials, connectors, volume and control requirements of the project. Production is carried out through our network; we centralise selection, coordination and supply so that you work with a single point of contact and a single order.
Type of assembly — internal machine wiring, board-to-peripheral interconnection, cabinet or sub-assembly
Connectors and terminals — involved, and the crimping tooling each part number requires
Volume and repeat orders — prototype unit, short pre-series or repeated series
Control — dimensional verification, electrical continuity and documentation, as we agree
Purchasing criterion — competitive price with verified quality, certification or lead time
The same build-to-print cable assembly can start as a single unit to validate a design and end as a recurring supply. When the project requires prior validation, the manufacturer prepares a sample and you approve it on your own equipment before a quantity is launched. From then on we keep the approved configuration between orders, so that repeating does not depend on reinterpreting the drawing.
If the assembly grows in branches and connectors, it is treated as custom wire harnesses and cable harnesses. If the project starts with validation, we approach it as prototype and low-volume cable assemblies.
Related information
What this service actually covers
Justicia Marin does not manufacture in facilities of its own: we select, coordinate and verify the supply through a network of manufacturers. The specific processes, tooling and capabilities depend on the manufacturer assigned to each project and are confirmed in writing in the quote before any order. Materials, cross-sections, tolerances and test requirements are agreed case by case from your specification.
Questions before the quote
Do you have a drawing or a sample?
With a drawing, a photograph or a physical sample we can start. If information is missing, we tell you exactly what we need to close the price.
What you can send us
We reply within 1 working day.