Wire and cable marking is the physical process that carries onto the material the coding that already exists in your documentation. The result is identification: anyone can tell, without interpreting, what each end is and where it goes. Grouping is the second branch of the same job: fixing the layout of the assembly so that it reaches the line with the agreed configuration. An assembly without identification forces people to interpret, and whoever interprets sometimes gets it wrong: at assembly, and above all in maintenance, months later with the equipment already installed.
What it involves
Marking and labelling are not the same. Marking goes on the cable or conductor itself — a sleeve, a ring, direct printing — and travels with it. Labelling adds an adhered or wrap-around carrier that allows longer texts, codes and full nomenclatures. Both coexist in the same assembly, and which one is used at each point is decided by the project documentation. From there comes identification: each conductor, each branch or the complete assembly associated with its function or its destination. Grouping then orders the assembly physically, so that it arrives with the shape it will have once installed and not as a bundle to be untangled.
Process control
The acceptance criterion is agreed in writing before the order and depends on the part number and the assigned manufacturer. On receipt only what was specified can be checked: what is not written cannot be verified. That is why this list does not describe what we offer, but what has to be settled with you before the batch is launched.
How this process is coordinated
The nomenclature is set by your documentation: we reproduce it, we do not invent it. These four steps are what prevent a criterion being lost between the order and the assembly line.
You give us the nomenclature
The identification criterion of your schematic, your maintenance system or your internal standard, exactly as already written.
We agree the method
We review the requirement and coordinate with the manufacturer which type of marking or labelling fits the expected environment and the length of the text.
You validate a sample
You check legibility and appearance on a real sample before it is applied to the complete batch.
It is applied to the batch
The identification stays identical in later orders, so as not to break your documentation or your history.
Common methods
The choice depends on the expected environment, the length of the text and who is going to read the mark: an operator on the line or a technician in the field two years later.
Marking on the conductor itself: the sleeve stays integral with the cable and does not depend on an adhesive. It is the usual option when an adhered label is not accepted.
Adhered or wrap-around carrier with printed text or code. It allows long nomenclatures that do not fit on a sleeve.
Cable ties, spiral wrap, braid or sleeve that fix the layout of the assembly according to the agreed configuration. Mechanical or environmental protection is a different capability.
The colour of the conductor or of the identifier as a quick visual aid in assembly, always subordinate to the written code.
Related information
What this process actually covers
This process is carried out by manufacturers in our network selected for each project: they are the ones who physically mark, label and group the material. Justicia Marin reviews the requirement with you, coordinates the supply and checks the batch received according to the agreed scope. We have no workshop, machinery or laboratory of our own — nor a marking printer, thermal-transfer line or automatic applicator — and we issue no certifications: certificates are those of the manufacturer or supplier that carries out the process. The nomenclature and the identification criterion are always defined by the customer: we do not generate codings of our own nor take responsibility for whether an external criterion is consistent with the rest of your documentation. The specific means available and the level of control that can be achieved are confirmed in writing in the quote before the order.
Where this capability ends: the mechanical and environmental protection of the assembly is defined separately, and grouping some conductors is not the same as protecting them. Checks on the batch and documentary traceability belong to cable assembly verification. As a technical reference of the sector, IPC/WHMA-A-620 devotes a specific section to marking and labelling of cable and harness assemblies.
Questions about the process
Does your assembly arrive without identification?
With your schematic and your identification criterion we coordinate the supply of marked, labelled and grouped assemblies, ready to fit.
What you can send us
We reply within 1 working day.