Skip to main content

Justicia Marin

Harness connected to a test fixture on a manufacturer’s bench during electrical testing of cable assemblies

Electrical testing of cable assemblies to schematic and acceptance criteria

An assembly can be perfectly manufactured and still have a crossed point. Electrical testing of cable assemblies exists so that this error appears before the assembly leaves for the customer, not when it is already mounted inside a closed piece of equipment. We are talking about assemblies and harnesses made to documentation: not the electrical installations of a building or network cabling certification.

  • Reply within 1 working day
  • Vetted manufacturers
  • Documentation on request
  • No universal minimum order

What it involves

What electrical testing of cable assemblies checks

The basic check confirms continuity — that each conductor conducts — and configuration — that it goes from the right point to the right point. That second check is the one that detects crossings, which are the most expensive failure to find once the equipment is assembled. Everything is compared against a reference: the wiring diagram, the contact table or the approved sample. Without that reference there is no result to judge.

  • Continuity of every conductor in the assembly
  • Point-to-point correspondence with the wiring diagram
  • Detection of crossings between circuits
  • Absence of unintended connections between points
  • Appearance of the ends and terminations
Continuity check on a cable assembly with a test probe and test fixture

Process control

Verifiable criteria of electrical testing

The acceptance criterion for electrical testing of cable assemblies is agreed in writing before the order and depends on the part number and the assigned manufacturer. What is not defined beforehand cannot be judged afterwards: this list does not describe what we offer, but what has to be settled with you.

  • Which schematic or connection table is current and at which revision
  • Which circuits are mandatory and which may stay free
  • What counts as a failure and what counts as acceptable
  • Whether the check is per unit or by sampling the batch
  • Whether the result must be recorded and in which format

How this process is coordinated

How the scope of electrical testing is agreed

The essential thing is to fix it before the order, not negotiate it after an incident.

1

You tell us the criticality

What consequence a failure has in that assembly and what level of checking you need per batch.

2

We check feasibility

We consult with the manufacturer what check it can really carry out on that type of assembly.

3

It is reflected in the quote

The scope of the check and its record are detailed in writing as part of the conditions.

4

It is applied on every delivery

The agreed criterion is kept in later orders, not only in the first.

What has to be decided

What level of electrical testing each assembly needs

These four axes define the scope of electrical testing of cable assemblies and are made specific in writing before each order.

Which connections must exist

The circuits that the schematic declares mandatory and that must show continuity from one end to the other.

Which connections must not exist

Crossings between circuits and contacts that should have no relation to each other. It is the most expensive failure to find late.

Which reference defines the result

Schematic, connection table or approved sample, with its revision. Without a reference there is no criterion to apply.

How it is accepted and recorded

Whether the check is per unit or by sampling, and whether the result must be documented. It is agreed in the quote.

What this process actually covers

This process is carried out by manufacturers in our network selected for each project; Justicia Marin defines the requirement with you, coordinates the supply and verifies the batch received. We have no workshop, machinery or laboratory of our own, and we issue no certifications: certificates are those of the manufacturer or supplier that carries out the process. The specific means available and the level of control that can be achieved are confirmed in writing in the quote before the order. Expressly: we have no laboratory and do not carry out standardised tests (certified dielectric strength, climatic tests, accredited vibration tests) unless expressly agreed with a capable manufacturer and reflected in the quote. The usual verification is continuity, configuration and visual inspection.

Where this capability ends: the supply of cable assemblies already checked before delivery is handled as cable assembly inspection. Checking position, route and fixing of an already assembled unit belongs to electrical sub-assemblies. The functional test of the finished product — with the equipment powered — is not part of this capability. As a technical reference of the sector, IPC/WHMA-A-620 treats continuity and short circuits as electrical test methods distinct from dielectric strength and insulation resistance, which are separate tests.

What level of verification do you need?

Tell us how critical the assembly is.

With the criticality of the assembly and your control requirement we define the scope of the verification and reflect it in the quote.

What you can send us

  • Bill of materials or part numbers (Excel, PDF or text)
  • Drawing or schematic for custom assemblies (PDF, DXF or similar)
  • Estimated quantity and expected repeat orders
  • Your priority: competitive price, certification or lead time
  • Required standards or documentation
  • Target delivery date

Tell us what you need to buy

We reply within 1 working day.